1. At Pitsford & Brampton station, 25/01/06 |
2. At Pitsford & Brampton station |
3. At Pitsford & Brampton |
4. Waiting for loading, 26/01/06 |
5. Loading up |
6. Almost on the trailer |
7. On the trailer |
8. Loaded & ready to go |
9. Final checks prior to moving |
10. Boughton Crossing, 1/2 mile from the loading point and almost on the road |
11. M1 Junction 19 - a slight problem occurred with the tractor unit so a hard shoulder stop was required |
12. By 6pm we'd reached Leicester Forest Services where Traffic Police ordered a stop until 7pm for rush-hour traffic to calm down |
13. Unloading at Quorn, 27/01/06 |
14. The only problem unloading happened when the bufferbeam & bogie came into contact, a regular occurrence when transporting this type of loco. This stopped the loco from unloading off the ramp completely.... |
15. ....and it had to be assisted by a short drag from the GCR p-way team & 25265 who happened to be at Quorn |
16. Finally unloaded, and sat at the back of the p-way train |
17. After being shunted into position 26010 waits at Quorn for transportation to Rothley |
18. The no.1 end, with all glazing intact, ready for moving south |
19. The view which will greet GCR passengers - a stranger to the Great Central |
20. One final look at 26010, with a tender behind |
| |