One of the overload relays showing the reason for replacing the studs. The 1/2
One of the overload relays showing the reason for replacing the studs. The 1/2" BSW stud (soldered in place) had snapped or sheared. This has happened to five of these studs, all of which have been thoroughly checked.
Restoration 2007
26010 Restoration @ fotopic.net
The task of manufacturing several new high-voltage contactor studs has been carried out over the last week by Andrew Harper & Stuart Sellar. This shows the 5/8Previous | NextA completed stud, different threads at each end.